Content

Resilience Road Network

© Crown copyright and database right 2012. All rights reserved 100017674.

The Resilience Road Network may replace the Priority One routes only in situations where severe weather conditions persist that cause shortage of grit supplies or other essential resources.

This will include the roads that need to be continuously kept open in severe winter weather to allow essential services to operate reliably and safely.

The decision to adopt the Resilience Network may be imposed by ourselves or the London Local Authority Gold and Transport for London, as part of a Pan-London Resilience Network.

Rate this page?